Can a PTP transparent clock replace a boundary clock in a wind monitoring network?
The short answer
A boundary clock and a transparent clock have different roles in Precision Time Protocol (PTP). Cisco describes a boundary clock that synchronizes locally and serves downstream timing ports. A transparent clock accounts for part of the delay when forwarding timing messages. A switch can restore Ethernet connectivity after replacement while changing the timing topology. Match the required clock role and downstream behavior before accepting the spare.
Find what the original switch provided
Record the supported profile, configured role, upstream timing source and downstream connections. In a hypothetical retrofit a replacement forwards ordinary network traffic and PTP packets, but it does not serve downstream devices as the original boundary clock did. The timing relationship can therefore change without an obvious change in reachability.
Compare the timing relationships on each side
Ask which clock the endpoints selected before and after the change. Preserve the identity and state of each relevant port, the applicable delay mechanism and the measured time error at a downstream endpoint. A table of switch features can identify possible roles, but the installed configuration and observed behavior determine which one the switch actually performed.
Approve the replacement against the intended topology
Have the responsible integrator document the accepted role and firmware with the timing test record. Include any different behavior on an alternate path that the project depends on. Keep ordinary packet forwarding and the required timing accuracy as separate acceptance items. This gives field service a clear basis for determining whether a replacement restored the measurement system as well as the data path.
Sources
- Cisco Nexus clock management and PTP clock roles
- Cisco industrial switch Precision Time Protocol configuration
Examples are illustrative. Confirm product-specific performance, compatibility and supply scope in the applicable documents.