Small wind power in context

Applications

Wind power, matched to the site.

Every application starts with a different energy problem. Explore the conditions that shape a wind power project, from the wind resource and demand profile to the electrical connection and installation access.

MARSTON supplies electric yaw wind turbines, controllers and converters for project-specific enquiries. Define the application first, then select the equipment and supporting infrastructure around the site.

Oilfield landscape with pumpjacks and electrical distribution lines under a clear blue sky.

01Application guide

Different sites. Different priorities.

Choose an application to explore the operating conditions and information needed for an equipment review.

Oilfield landscape with pumpjacks and electrical distribution lines under a blue sky.

Remote energy operations

Start with the operating load.

Oilfield locations can combine open terrain with dispersed electrical loads. Evaluate wind against the actual pumping, auxiliary and monitoring demand at the proposed connection point. Motor starting, duty cycles and the existing power supply shape the equipment review. Installation siting must also address access, operating clearances and any hazardous-area restrictions identified by the project team.

Demand
Load schedule, motor starting and the critical equipment to be supplied.
Connection
Existing grid or generator supply, voltage and proposed connection point.
Siting
Wind exposure, operational clearances and access for construction and service.
View the oilfield project
Illustration of an industrial site considered as a potential wind power application.

On-site energy demand

Connect wind to the operating schedule.

Industrial sites need a comparison between wind availability and the hours when electricity is consumed. Review the proposed turbine location separately from the buildings and processes it will serve: obstructions can change the wind conditions. Assess the connection arrangement, permitted export and installation footprint alongside the demand profile before choosing a turbine rating.

Demand
Consumption records, shift patterns and seasonal changes in electrical demand.
Wind
Hub-height wind evidence, nearby buildings and available turbine siting space.
Connection
Site distribution, export conditions and the required local connection approvals.
VIew the industrial project
Cranes positioning a wind turbine during tower installation under a blue sky.

Sites beyond easy access

Plan for the quiet periods too.

Remote monitoring stations, communications equipment and isolated facilities require a clear supply-continuity plan. Wind is one possible generation source; its contribution depends on the local resource and demand. Define critical loads, existing solar or generator equipment, and the approach to calm periods. Transport, service visits and spare-part access also belong in the equipment decision.

Continuity
Critical loads, required operating hours and the existing backup arrangements.
Interfaces
Electrical demand and the specifications of equipment already on site.
Access
Transport limitations, lifting arrangements and the practical schedule for maintenance.
Explore remote-site power planning
Concept illustration of wind turbines within a proposed microgrid setting.

Independent electrical networks

Review the whole electrical network.

An island or isolated community may operate with generators, solar and other distributed equipment. Adding wind requires a review of how the network establishes voltage and frequency, balances generation and demand, and responds to changes. Identify the control authority and operating modes before specifying the wind subsystem. Coastal exposure and delivery logistics need a separate site review.

Network
Network diagram, operating modes and equipment responsible for voltage and frequency.
Coordination
Existing generation, load priorities and the control interfaces to be reviewed.
Environment
Exposure conditions, delivery access and the planned local service arrangements.
Explore off-grid system planning
Wind turbine viewed upward from the base of its tower against a clear blue sky.

Complementary generation review

Compare generation when the load needs it.

Wind and solar should be compared across the same time periods and against the same demand profile. A hybrid arrangement is useful only where the site evidence and system design support it. Provide the proposed electrical diagram and equipment specifications, including any third-party storage, so the wind subsystem and its interfaces can be assessed within the wider installation.

Resource
Wind and solar profiles compared with hourly and seasonal electricity demand.
Architecture
Proposed system diagram and the ratings of the existing electrical equipment.
Interfaces
Control, protection and third-party storage compatibility for the proposed configuration.
Review hybrid project requirements
Illustrative wind power research platform with equipment monitoring and data displays.

Defined measurement objectives

Design the study around the questions.

Research and demonstration projects need explicit objectives before equipment is selected. Define which mechanical, electrical or environmental variables the study will measure, along with the measurement intervals and access requirements. Discuss available equipment interfaces and documentation for the proposed configuration. Instrumentation, data acquisition and supervised operation should be specified as part of the project scope.

Objectives
Research questions, variables to be measured and the planned measurement schedule.
Data
Required sensors, logging arrangements and confirmed access to equipment interfaces.
Operation
Supervision, installation responsibilities and the agreed scope of technical documentation.
Discuss research equipment requirements

02Before selecting equipment

Three questions shape the project.

01

What wind reaches the rotor?

Review the measurement source, height, terrain and obstructions. Use evidence representative of the proposed turbine location.

02

Where will the energy go?

Compare wind with the load schedule and existing supply. Define connection requirements, critical loads and any permitted export.

03

Can the site support the installation?

Check transport, lifting, foundations and service access. Include local approvals and compare wind with the practical alternatives.

Project discussion

Tell us about your site.

Share the location, wind information, electrical demand and existing equipment. We can discuss the turbine, controller or converter scope your project needs.

Applications / Further reading

More application guides

Connect the operating duty and site environment with the information needed for a project review.