What wind reaches the rotor?
Review the measurement source, height, terrain and obstructions. Use evidence representative of the proposed turbine location.
Small wind power in context
Every application starts with a different energy problem. Explore the conditions that shape a wind power project, from the wind resource and demand profile to the electrical connection and installation access.
MARSTON supplies electric yaw wind turbines, controllers and converters for project-specific enquiries. Define the application first, then select the equipment and supporting infrastructure around the site.
01Application guide
Choose an application to explore the operating conditions and information needed for an equipment review.
Remote energy operations
Oilfield locations can combine open terrain with dispersed electrical loads. Evaluate wind against the actual pumping, auxiliary and monitoring demand at the proposed connection point. Motor starting, duty cycles and the existing power supply shape the equipment review. Installation siting must also address access, operating clearances and any hazardous-area restrictions identified by the project team.
On-site energy demand
Industrial sites need a comparison between wind availability and the hours when electricity is consumed. Review the proposed turbine location separately from the buildings and processes it will serve: obstructions can change the wind conditions. Assess the connection arrangement, permitted export and installation footprint alongside the demand profile before choosing a turbine rating.
Sites beyond easy access
Remote monitoring stations, communications equipment and isolated facilities require a clear supply-continuity plan. Wind is one possible generation source; its contribution depends on the local resource and demand. Define critical loads, existing solar or generator equipment, and the approach to calm periods. Transport, service visits and spare-part access also belong in the equipment decision.
Independent electrical networks
An island or isolated community may operate with generators, solar and other distributed equipment. Adding wind requires a review of how the network establishes voltage and frequency, balances generation and demand, and responds to changes. Identify the control authority and operating modes before specifying the wind subsystem. Coastal exposure and delivery logistics need a separate site review.
Complementary generation review
Wind and solar should be compared across the same time periods and against the same demand profile. A hybrid arrangement is useful only where the site evidence and system design support it. Provide the proposed electrical diagram and equipment specifications, including any third-party storage, so the wind subsystem and its interfaces can be assessed within the wider installation.
Defined measurement objectives
Research and demonstration projects need explicit objectives before equipment is selected. Define which mechanical, electrical or environmental variables the study will measure, along with the measurement intervals and access requirements. Discuss available equipment interfaces and documentation for the proposed configuration. Instrumentation, data acquisition and supervised operation should be specified as part of the project scope.
02Before selecting equipment
Review the measurement source, height, terrain and obstructions. Use evidence representative of the proposed turbine location.
Compare wind with the load schedule and existing supply. Define connection requirements, critical loads and any permitted export.
Check transport, lifting, foundations and service access. Include local approvals and compare wind with the practical alternatives.
Project discussion
Share the location, wind information, electrical demand and existing equipment. We can discuss the turbine, controller or converter scope your project needs.
Applications / Further reading
Connect the operating duty and site environment with the information needed for a project review.
Assess wind electricity for pumping using water demand, head, pump curves, motor-drive requirements, storage timing and alternative supply options.
Read the guideEvaluate wind power for remote instruments using duty cycles, sensor and telemetry loads, continuity requirements, site effects and backup interfaces.
Read the guideReview coastal wind projects with exposure records, material and coating evidence, enclosure interfaces, corrosion-test scope and service responsibilities.
Read the guideCompare rooftop and ground wind sites using resource exposure, structural evidence, acoustic and vibration requirements, access and installation scope.
Read the guideReview motor starts with drive data, transient current and duration, supply behaviour, concurrent loads and configuration-specific evidence.
Read the guideAssess greenhouse wind power with climate-control schedules, electrical and thermal boundaries, essential loads, site constraints and backup requirements.
Read the guideReview cold-storage wind power with refrigeration states, delivery schedules, electrical input records, continuity requirements and supply boundaries.
Read the guideAssess water-facility wind power with process loads, pumping and aeration records, continuity criteria, electrical boundaries and operator responsibilities.
Read the guideAssess camp wind projects using deployment duration, separate camp and exploration loads, fuel records, access constraints and project-specific supply duties.
Read the guideReview temporary-site wind feasibility with phased loads, usable deployment time, installation and removal scope, supply duties and redeployment evidence.
Read the guideEvaluate highway service-area wind power using traffic-linked demand, tenant loads, charging scenarios, road-owner constraints and electrical supply evidence.
Read the guideReview landside wind projects with terminal load boundaries, cargo and charging schedules, working-area constraints, environmental evidence and owner duties.
Read the guideAssess aquaculture aeration, circulation and auxiliary electrical loads using actual duty schedules, continuity requirements and wind resource evidence.
Read the guideAssess depot charging windows, measured input energy, site demand and wind contribution without assuming charger compatibility or increased grid capacity.
Read the guideDefine learning goals, observation data, campus responsibilities and project costs before choosing a small wind education or demonstration installation.
Read the guideAssess fence energizer input, distributed load locations and local supply options before considering a 5–50 kW wind turbine for ranch fencing.
Read the guide