Solutions / Grid-connected systems

Grid-tied wind power

Connect wind generation to the way your site uses electricity. MARSTON supplies electric yaw wind turbines, controllers and power conversion equipment for project-specific configurations. Start with the wind resource, on-site demand and utility connection requirements, then define the equipment and installation scope.

Electrical cabinet with terminal blocks, wiring and circuit protection components.
Equipment reference / Electrical cabinet detail.

01 / Project fit

Start at the site. Work toward the connection.

For farms, workshops and industrial facilities with a utility supply, the useful contribution of wind depends on when it generates and how that output can be used. Review these three factors before choosing a turbine.

01

Wind at the proposed tower

Use wind measurements with their recording height and period, together with terrain, obstacles and the intended tower location. Regional wind maps can support an initial screen; equipment selection needs a closer view of the actual site.

02

Demand and permitted export

Compare the timing of generation with site consumption. An hourly load profile helps distinguish electricity used on site from potential surplus. Record any export limit and the applicable metering arrangement before estimating the value of that surplus.

03

A workable connection

Identify the utility, connection point and local application process. Collect the required electrical characteristics, protection criteria and equipment documentation early, so these requirements guide converter selection and the project budget.

02 / System functions

Define the path to grid-compatible power.

A grid-tied wind power system combines wind generation, turbine control, power conversion and a permitted site connection. These functions must be reviewed together when specifying the electrical package.

  1. 01

    Wind generation

    Select the turbine against the site resource and operating conditions. Use the applicable model data and power curve when estimating energy production, rather than multiplying rated power by operating hours.

  2. 02

    Turbine control

    Specify the controller, sensors, operating states and protection interfaces for the selected turbine. Document how control and any required energy dissipation are coordinated with the proposed conversion equipment.

  3. 03

    Power conversion

    Match the converter input to the turbine and controller arrangement, and its output to the required connection. Define voltage, frequency, phase configuration and ratings at each interface.

  4. 04

    Site & utility interface

    The electrical design identifies switchgear, isolation, earthing, protection, metering and the point of connection. Operation and any export follow the approved utility arrangement.

Functional overview, not a wiring diagram. Final equipment arrangement is project-specific.

03 / Equipment & responsibilities

Make the quotation specific.

Build the supply schedule around the equipment, interfaces and documents your project needs. Separate the wind equipment from local installation and utility responsibilities.

01

Electric yaw turbines

The current range covers FD5-5KW, FD7.5-10KW, FD10-20KW, FD12-30KW and FD14-50KW. Review the 5, 10, 20, 30 and 50 kW models against the site and required equipment scope.

02

Controllers & converters

Turbines, controllers and converters can be discussed as separate supply items. The quotation should identify each selected item, its electrical interfaces and the operating configuration it is intended to support.

03

Tower & site works

Tower supply can be coordinated with a tower supplier. Assign responsibility for the foundation, structural review, lifting, cable installation and local electrical works in the project scope.

04

Documents & commissioning

Agree the applicable specifications, interface drawings, installation information and commissioning responsibilities. List destination-market documentation requirements in the enquiry so they can be checked against the proposed equipment.

04 / Project inputs

Bring the details that determine the design.

Send the information below with your enquiry. Existing drawings and equipment data sheets are useful even at an early planning stage.

  1. 01

    Site & wind

    Country and location; wind records and measurement height; terrain and nearby obstacles; proposed tower position; access and installation constraints.

  2. 02

    Electrical supply

    Connection voltage, frequency and number of phases; proposed connection point; existing single-line diagram; utility name and any available interconnection requirements.

  3. 03

    Consumption & export

    Electricity bills or consumption records, an hourly load profile where available, operating hours, intended self-consumption and the permitted export arrangement.

  4. 04

    Supply & delivery

    Preferred turbine size or project objective, required controller and converter scope, tower arrangements, local installation partner, document requirements and schedule.

05 / Engineering questions

Before you connect.

Will a grid-tied wind turbine keep the site running during a power cut?

A grid connection alone does not provide backup power. Supplying loads during an outage requires a separately designed arrangement with suitable equipment and isolation from the utility. Include any outage requirement in the initial enquiry.

Can surplus wind electricity be exported or sold?

The utility agreement and local rules determine whether export is permitted, how it is metered and whether payment applies. Use the terms available for your connection when evaluating the project; do not assign a sales value to surplus electricity before those terms are established.

What if the utility allows no export?

State the restriction and provide the utility requirements. The project team must establish how generation, site demand, control and protection will meet that condition. An export restriction is a system-design requirement to evaluate, rather than a standard capability implied by the turbine rating.

Can I use an existing grid-tied converter?

Send its manufacturer, model, input limits, control requirements and approval documents, together with the system diagram. The turbine output and controller arrangement must match the proposed converter. A unit used with another generator or with solar PV is not automatically suitable for this wind system.

How should I choose between 5, 10, 20, 30 and 50 kW?

Compare the site wind distribution, the applicable turbine performance information, expected losses and the load profile. Then check connection limits, installation requirements and the permitted use of surplus energy. Rated power is one selection input; it does not describe annual production or the share of consumption covered.

Your site. Your connection.

Plan your grid-tied wind project.

Share the location, wind information, consumption profile and utility requirements. We can discuss the turbine, controller or converter scope for your enquiry.