APPLICATION REFERENCES
Small wind project references
Explore five equipment configurations from 5 to 30 kW, with the interfaces and site questions to check before you specify a system.
Find a reference for your project
Anonymized third-party reports. Each card shows the stage described in its source.
Connect wind to the grid
A variable-pitch turbine, wind controller with diversion load, grid inverter and freestanding tower.
What to check
- Agree the AC connection and export limit.
- Check turbine control on grid loss and confirm the tower foundation.
Charge a battery from wind
A standalone wind package with a charge controller, diversion load and separate monitoring equipment.
What to check
- Confirm battery chemistry, voltage and charge-current limits.
- Agree the response when the battery is full or charging disconnects.
Feed a hybrid inverter
A turbine, wind controller with diversion load and three-phase hybrid inverter, listed as separate equipment.
What to check
- Match controller output to the inverter input.
- Define backup loads and intended grid or standalone modes.
Plan freight and site access
The packing report covered wind turbines and freestanding towers prepared for transport.
What to check
- Request package dimensions, mass and lifting points by item.
- Check unloading access and assign arrival inspection.
Define the supply scope
A grid-tied equipment list covering the turbine, wind controller and diversion load, inverter and tower.
What to check
- Separate turbine power from converter output rating.
- Assign supply, installation and commissioning responsibilities.