01 / Project fit
Start with the load. Plan for the calm.
Off-grid wind power serves a site without relying on a utility connection. For remote facilities and agricultural operations, turbine selection is part of a plan for generation, demand and continuity of supply.
01Energy and peak demand
List daily electricity use as well as maximum simultaneous demand. Pumps, motors and other starting loads may place different demands on conversion equipment from steady operation. Separate essential loads from equipment whose operating time can be adjusted.
02Wind over time
Review seasonal and daily wind patterns alongside the operating schedule. Include measurement height, terrain and nearby obstacles. The timing and duration of low-wind periods matter when planning how the site will maintain its required supply.
03A continuity plan
Define which loads must remain available and for how long. Establish the intended roles of third-party storage, backup generation and load management, then review the proposed equipment and control interfaces as one system.
02 / System functions
Give every part a defined role.
Wind generation, control and conversion, energy management and site loads form the engineering scope. Their electrical arrangement depends on the equipment, existing installation and required operating modes.
- 01
Wind generation
Select the wind turbine using site conditions and model-specific performance information. Its role is to contribute variable generation to the site energy balance, within the agreed operating conditions.
- 02
Control & conversion
Define the controller, conversion equipment and electrical interfaces for the turbine. Review the required response to changing wind, changing demand and any limits imposed by the rest of the system.
- 03
Energy management
Where required, third-party storage and backup support the supply plan during low generation. Establish charging limits, energy availability, operating priorities and the responsibilities for coordinating those devices.
- 04
Site loads
Identify the AC and DC supplies required by the equipment, distribution and protection arrangements, starting loads and any load-shedding priorities. Use these requirements to define the site power system.
Functional overview, not a wiring diagram. Final equipment arrangement is project-specific.
01Electric yaw turbines
Discuss the FD5-5KW, FD7.5-10KW, FD10-20KW, FD12-30KW and FD14-50KW models. Their rated powers are 5, 10, 20, 30 and 50 kW; off-grid selection also needs the load and wind profiles.
02Controllers & conversion
MARSTON can supply turbines and controllers separately, with converter requirements reviewed for the selected arrangement. Identify equipment ratings, interfaces and the intended operating modes in the quotation.
03Third-party storage & backup
MARSTON does not manufacture its own energy storage products. Identify the storage and backup suppliers, their equipment specifications and the system integrator so compatibility and responsibilities can be agreed.
04Tower, installation & service
Tower supply can be coordinated with a tower supplier. The project scope should allocate foundation design, lifting, electrical installation, commissioning and maintenance access, including practical service arrangements for a remote location.
- 01
Load schedule
Equipment list, running power, operating hours and daily energy use; simultaneous peak demand; motor-starting requirements; critical loads and allowable interruptions.
- 02
Site & wind records
Location, terrain, obstacles, proposed tower position and height, available wind measurements, seasonal access and any environmental or installation constraints.
- 03
Existing equipment
System diagram and equipment data sheets: controllers, inverters, battery packs and battery management systems, solar equipment and backup generators where present.
- 04
Operating requirements
Required AC or DC supplies, low-wind operating plan, storage autonomy target if applicable, backup availability, maintenance arrangements, supply scope and project schedule.