Solutions / Independent power systems

Off-grid wind power

Plan wind generation around the loads your remote site needs to run. MARSTON supplies electric yaw wind turbines and controllers, with power conversion defined for the project. Review wind, demand, third-party storage and backup together to establish the site supply plan.

Oilfield landscape with pumpjacks and overhead electrical lines.
Site context / Oilfield landscape.

01 / Project fit

Start with the load. Plan for the calm.

Off-grid wind power serves a site without relying on a utility connection. For remote facilities and agricultural operations, turbine selection is part of a plan for generation, demand and continuity of supply.

01

Energy and peak demand

List daily electricity use as well as maximum simultaneous demand. Pumps, motors and other starting loads may place different demands on conversion equipment from steady operation. Separate essential loads from equipment whose operating time can be adjusted.

02

Wind over time

Review seasonal and daily wind patterns alongside the operating schedule. Include measurement height, terrain and nearby obstacles. The timing and duration of low-wind periods matter when planning how the site will maintain its required supply.

03

A continuity plan

Define which loads must remain available and for how long. Establish the intended roles of third-party storage, backup generation and load management, then review the proposed equipment and control interfaces as one system.

02 / System functions

Give every part a defined role.

Wind generation, control and conversion, energy management and site loads form the engineering scope. Their electrical arrangement depends on the equipment, existing installation and required operating modes.

  1. 01

    Wind generation

    Select the wind turbine using site conditions and model-specific performance information. Its role is to contribute variable generation to the site energy balance, within the agreed operating conditions.

  2. 02

    Control & conversion

    Define the controller, conversion equipment and electrical interfaces for the turbine. Review the required response to changing wind, changing demand and any limits imposed by the rest of the system.

  3. 03

    Energy management

    Where required, third-party storage and backup support the supply plan during low generation. Establish charging limits, energy availability, operating priorities and the responsibilities for coordinating those devices.

  4. 04

    Site loads

    Identify the AC and DC supplies required by the equipment, distribution and protection arrangements, starting loads and any load-shedding priorities. Use these requirements to define the site power system.

Functional overview, not a wiring diagram. Final equipment arrangement is project-specific.

03 / Equipment & responsibilities

Specify the wind equipment and the wider system.

Define the boundaries between wind equipment and the wider site system. Identify supply items and responsibility for integration.

01

Electric yaw turbines

Discuss the FD5-5KW, FD7.5-10KW, FD10-20KW, FD12-30KW and FD14-50KW models. Their rated powers are 5, 10, 20, 30 and 50 kW; off-grid selection also needs the load and wind profiles.

02

Controllers & conversion

MARSTON can supply turbines and controllers separately, with converter requirements reviewed for the selected arrangement. Identify equipment ratings, interfaces and the intended operating modes in the quotation.

03

Third-party storage & backup

MARSTON does not manufacture its own energy storage products. Identify the storage and backup suppliers, their equipment specifications and the system integrator so compatibility and responsibilities can be agreed.

04

Tower, installation & service

Tower supply can be coordinated with a tower supplier. The project scope should allocate foundation design, lifting, electrical installation, commissioning and maintenance access, including practical service arrangements for a remote location.

04 / Project inputs

Describe a day at your site.

Explain what must run, when it runs and what happens when wind is low. Add the information and documents below.

  1. 01

    Load schedule

    Equipment list, running power, operating hours and daily energy use; simultaneous peak demand; motor-starting requirements; critical loads and allowable interruptions.

  2. 02

    Site & wind records

    Location, terrain, obstacles, proposed tower position and height, available wind measurements, seasonal access and any environmental or installation constraints.

  3. 03

    Existing equipment

    System diagram and equipment data sheets: controllers, inverters, battery packs and battery management systems, solar equipment and backup generators where present.

  4. 04

    Operating requirements

    Required AC or DC supplies, low-wind operating plan, storage autonomy target if applicable, backup availability, maintenance arrangements, supply scope and project schedule.

05 / Engineering questions

Before you go off grid.

Can a wind turbine provide continuous off-grid power on its own?

Wind output varies with the resource. Continuous supply must be addressed by the complete system, using the selected combination of generation, storage, backup and load management. A turbine rated at 10 kW, for example, is not a promise of 10 kW throughout the day.

How much battery storage will the site need?

Begin with the essential energy demand during the period the battery must cover. The design also considers usable capacity, power limits, temperature, conversion losses and the agreed low-wind operating plan. There is no single battery size associated with a particular turbine rating; storage is specified with the third-party supplier and system integrator.

Can the turbine work with my existing battery inverter?

Provide the inverter and battery model numbers, electrical limits, battery management system information and system diagram. Review the wind controller and conversion path against those requirements before selecting equipment. Sharing a nominal voltage or connector does not establish compatibility.

Can wind be added to an off-grid solar installation?

It can be evaluated as part of a hybrid project. Compare local wind and solar generation patterns with the load schedule, then review the existing inverter, storage and control architecture. The contribution of wind and the electrical integration need to be established for that site and equipment.

What happens when the battery is full or site demand falls?

The design must define how the wind subsystem responds when the wider system cannot accept generation. Review the required turbine control, protection and any energy-dissipation equipment for that operating condition. The appropriate response depends on the selected turbine, controller and electrical arrangement.

Your loads. Your operating plan.

Define your remote-site power requirements.

Send your load schedule, wind information and existing equipment details. We can discuss the wind turbine, controller and power conversion scope within the proposed off-grid system.