What should a preservation plan cover for stored wind equipment?
The short answer
A storage preservation plan should identify each equipment category, its applicable instructions, required conditions, inspection tasks, responsibilities and release checks. Base the plan on the actual components and expected storage duration. Keeping equipment inside its delivery packaging does not automatically satisfy every preservation requirement, particularly if the original transport assumptions change after arrival.
Classify the stored equipment
Create an inventory with asset or part identity, packaging state, storage location and the supplier's relevant preservation reference. Distinguish assemblies that remain sealed from items opened for inspection or staged for installation. Record when storage starts and any exposure already experienced during transport. Ask the supplier to clarify instructions that do not address the expected delay. Do not invent common temperature, humidity or movement intervals for all generators, blades, converters or other supplied components.
Assign practical inspection duties
Specify what is checked, by whom, at what trigger and using which acceptance instructions. The plan may require condition observations, protection checks or other equipment-specific actions approved by the supplier. Provide a route for reporting uncertain findings and obtaining technical disposition. A task marked completed should connect to an actual item and observation. Record deviations from the intended environment rather than maintaining a clean checklist that conceals a roof leak, broken barrier or missed preservation activity.
Define release from storage
Before installation, review the storage history and complete the applicable condition and preparation checks with competent personnel. Identify any required tests, preservation removal or renewed supplier approval. Close discrepancies before the item enters installation-ready stock. Retain the preservation record with the asset history, including any period of uncertain custody. A useful plan makes responsibilities and evidence visible across a delay; it is not a warranty that equipment remains suitable indefinitely merely because its exterior appears unchanged.
Sources
- IMO/ILO/UNECE: CTU Code — cargo packing and handling background
- UK Health and Safety Executive: maintenance of work equipment
Examples are illustrative. Confirm product-specific performance, compatibility and supply scope in the applicable documents.