Can wind and factory load records from different years be paired by the same calendar hour?

Small wind / Buyer questions

Site measurement and data handoff

Can wind and factory load records from different years be paired by the same calendar hour?

The short answer

They can be combined to build a stated scenario. A calendar-hour match from different years does not establish that wind and demand occurred together. It can preserve part of the seasonal and daily pattern while changing the relationship between load and weather. The suitability of that shortcut depends on the decision.

Check why the load changes

Some industrial demand follows fixed production shifts. Other demand changes with temperature, rainfall, occupancy or an operation that responds to site conditions. Pairing unrelated years can put a weather-driven load beside wind from a different weather event. Aligning the hour of day cannot repair that dependence. The dsgrid work illustrates why time-synchronized load and renewable series matter when a study needs their actual relationship.

Make synthetic pairing visible in the analysis

Keep the original dates and document whether the new pairing preserves season, weekday pattern and operating hours. Test more than one defensible pairing when the data permit it. For example, compare cases with high process demand occurring during both weaker and stronger wind conditions. If the estimated useful energy changes materially, report that sensitivity rather than relying on a single calendar match.

Ask for overlapping evidence when coincidence matters

For a procurement decision tied to avoided imports, obtain concurrent resource and demand records where possible, or use a documented load model driven by the same weather and operating inputs. Retain missing intervals and identify measured versus modeled series. A synthetic match can inform an early comparison when its limits are stated. It cannot certify observed coincidence or uninterrupted supply during the original years.