Small wind / Buyer questions
Site measurement and data handoff
Can fixed-block load data reproduce a rolling demand peak for a wind project?
The short answer
A rolling window can straddle two fixed blocks, so fixed-block averages may hide the largest rolling value. Before estimating demand-charge savings, confirm which intervals the relevant meter and tariff use. Equal interval durations do not establish equal window boundaries or equal results.
Identify exactly which demand is measured
Request the configured method, window length, update step, clock alignment and quantity used by the meter or the utility. A meter can report several demand statistics. Schneider Electric's PowerLogic documentation illustrates selectable block and sliding methods on one device family. The System Advisor Model describes demand terms that vary with the tariff. Neither example establishes the method for this project.
Test what the existing export can reconstruct
Consider two hypothetical fixed intervals of 30 minutes. A 12 kW load runs for the last 15 minutes of the first and the first 15 minutes of the second, with no load otherwise. Each fixed average is 6 kW. A rolling 30-minute window covering the entire run averages 12 kW if the method evaluates a window on those boundaries. The two fixed averages alone cannot show where the load fell inside either block.
Apply the same rule to the wind scenario
If finer synchronized data exist, reconstruct the required windows for net site demand and compare equivalent conditions with and without the wind contribution. When the source resolution cannot reproduce the peaks, state the limitation and obtain the proper utility or meter demand record before valuing a reduction. Wind generation outside the relevant demand window may reduce purchased energy without changing the peak used on the bill.
Sources
- Schneider Electric PowerLogic demand meter example: block, sliding and rolling methods
- System Advisor Model: billed demand and tariff-specific definitions
Examples are illustrative. Confirm product-specific performance, compatibility and supply scope in the applicable documents.