Small wind / Buyer questions
Site measurement and data handoff
Can a site add feeder and branch meter totals when preparing a wind load profile?
The short answer
Add the readings only when they represent separate flows into the chosen load boundary. If the feeder meter already includes the branch, adding its submeter total counts that branch twice. The branch remains useful for understanding which process used the electricity and when it operated.
Trace the hierarchy on the site drawing
Ask which loads each feeder and branch meter measures, whether any site generation crosses those boundaries and how long the wiring configuration applied. The US Department of Energy's metering guidance distinguishes aggregate building, panel, circuit and end-use levels. Two meters at different levels may describe part of the same electrical path. Confirm the actual drawing and meter schedule rather than assuming that all rows in an export represent independent loads.
Reconcile totals with a common period
In a hypothetical interval, a feeder records 12 kWh and one branch inside it records 5 kWh. With no other flows between the defined boundaries, the rest of the feeder accounts for 7 kWh, including any intervening losses. The site total at the feeder remains 12 kWh. If the records disagree, compare the same intervals and sign conventions, and check whether any required branches or losses remain outside the submeters.
Give the turbine assessor a usable load split
Send a whole-boundary series and a separately labelled breakdown of important loads. If no complete feeder record exists, sum only confirmed nonoverlapping branches and identify the unmetered demand. Note which processes might be shiftable and which must remain in service. This lets the wind proposal test coincidence with the relevant loads without treating an accounting subtotal as extra electrical demand.
Sources
Examples are illustrative. Confirm product-specific performance, compatibility and supply scope in the applicable documents.