Small wind / Buyer questions
Electrical measurement evidence
Does a reading-only accuracy figure cover a wind power test?
The short answer
Only if that is the complete applicable specification. Some analyzer specifications contain both a reading term and a range term. Yokogawa's high-current measurement note illustrates that combination separately from sensor contributions. A headline percentage of reading can therefore omit part of the stated error basis. Request the full equation and selected ranges for the actual wind-test operating point.
Keep the full specification with the selected ranges
Record the analyzer, input configuration, voltage and current ranges, signal frequency and relevant specification conditions. Ask how the manufacturer defines the power range used in its error expression. Include any sensor and other applicable contributions separately. A calibration certificate and a product headline should be matched to the actual quantity and conditions rather than used as interchangeable descriptions of the measurement capability.
Compare the terms at the intended reading
Consider an invented procurement example with a specification of 0.1% of reading plus 0.1% of range. At 10 W on a 1000 W range, those terms are 0.01 W and 1 W before other contributions. These illustrative figures are not a specification for an offered instrument. They show why omitting the range term can materially change the acceptance assessment even when the displayed number has many digits.
Retain the accepted error and uncertainty basis
Keep the applicable specification revision, actual ranges and calculation with the result. Have the responsible metrology reviewer state how the relevant contributions enter the agreed decision rule. If another range is used later, identify the changed basis before comparing results. This gives the buyer a traceable explanation of what the measured power can establish, including whether a small apparent difference is resolved by the selected measurement chain.
Sources
Examples are illustrative. Confirm product-specific performance, compatibility and supply scope in the applicable documents.