Does a rated-current CT test establish accuracy at low wind generation?

Small wind / Buyer questions

Metering and instrument transformers

Does a rated-current CT test establish accuracy at low wind generation?

The short answer

A current transformer's metering accuracy can be specified at different current levels and burdens. ABB shows examples in which ratio and phase performance are assessed at distinct operating points. A passing observation at rated current does not establish a result at a different current unless the applicable documentation covers that range. Check the installed transformer and the measurement requirement for low-output operation.

Identify the site's current range and evidence

Record the selected transformer, ratio, burden and the operating current range of interest. In a hypothetical wind project much of the useful monitoring occurs at a lower current than the point shown in the test summary. The summary can establish its tested point while leaving a different operating range to confirm.

Read the applicable accuracy class and test points

Ask the qualified reviewer to match the exact device, current range and burden to the manufacturer or approved calibration evidence. Keep ratio and phase effects with their relevant conditions. Distinguish the primary current level from the load power factor and the capabilities of the downstream meter. They can each affect the measurement without being interchangeable. Retain the evidence for the burden that was present during the observation, since the test and the installed circuit may differ.

Record the usable range for the data study

Have the responsible team identify which data intervals are supported by the measurement evidence. Retain the result and any unresolved conditions in the site record. This helps a wind assessment use low-output data appropriately without extrapolating a rated-current result or applying a class example from a different transformer.

Sources

Examples are illustrative. Confirm product-specific performance, compatibility and supply scope in the applicable documents.