Small wind / Buyer questions
Electrical retrofit interfaces
Does balanced real power prove that parallel generators share reactive load in a wind hybrid system?
The short answer
Balanced active power readings do not establish the distribution of reactive power. In a hybrid plant with parallel generating sets, one unit can carry a disproportionate share of reactive load while the real-power split looks acceptable. Ask for measurements and limits for each source in the operating state being accepted.
Identify the sharing objective
The control design may require sharing in proportion to the capacities of the available units. Equal readings are not necessarily the target when ratings differ. Ask the designer to specify the desired division of real and reactive load and where the quantities are measured. A site total can hide unequal current in the individual branches.
Cummins Generator Technologies distinguishes real-power sharing associated with the engine controls from reactive sharing associated with alternator voltage regulation. A matching real-power observation does not substitute for checking the voltage-regulation side.
Use the data from the same operating interval
Request simultaneous active power, reactive power, voltage and current records for each generator with the connected wind equipment in the relevant state. Ask what sign convention is used for supplied and absorbed reactive power. A source can approach its applicable current or reactive capability limit even when the active-power share looks reasonable.
Where the wind converter can also affect reactive power, use the supplied equipment and control documentation to identify its actual role before interpreting the generator results.
Record what sharing behavior the quote covers
Provide the generator ratings, alternator and control details, single-line drawing and proposed source combinations. Ask the integrator to state the approved sharing criteria and evidence for each relevant operating mode. Compare results with the individual source limits, including cases where a source is unavailable if the project requires them. Resolve any unequal sharing before relying on the proposed hybrid arrangement.
Sources
Examples are illustrative. Confirm product-specific performance, compatibility and supply scope in the applicable documents.