The short answer
Yes. A generating branch can send power upstream to loads elsewhere within the site while the utility connection remains within its export allowance. The amount crossing the utility meter answers a question at that boundary. It does not identify the direction or current on each feeder. Tesla documents one product example in which an internal panel limit is handled separately from a site export limit. Apply the applicable engineering criteria to the actual wind installation.
Draw the paths between generation and local loads
Identify the feeder from the wind equipment, other sources and the location of the consuming loads. Mark where power direction or current is measured on the single-line drawing. A normal site-level reading can coexist with a different flow direction in part of the distribution network.
Compare the installation against its own circuit evidence
In a hypothetical site, generation on one feeder supplies loads connected to another feeder. The net flow at the utility connection remains within the agreed limit. The engineering team still needs the relevant current, direction and equipment documentation for the circuit that carries the internal flow. Equipment ratings and protection coordination depend on the installed arrangement.
Keep the two acceptance records separate
Retain the connection-point evidence for the utility limit and the internal circuit records for the equipment review. Link both to the same operating case and configuration. The wind supplier can then see which constraints apply to the site interface and which must be resolved within the site's distribution equipment.