Can a Plan 62 quench be counted as the process-side flush required by a pump seal?

Small wind / Buyer questions

Mechanical seals and support circuits

Can a Plan 62 quench be counted as the process-side flush required by a pump seal?

The short answer

The supplied service must match the specified side and function. John Crane describes Plan 62 as improving the atmospheric side of a single seal with a quench. A process-side flush addresses a different circuit boundary. Ask the pump and seal suppliers to identify which connections and services satisfy each requirement before accepting the package scope.

Map each service to the seal drawing

Record the seal arrangement, quench and flush connections, fluid sources and returns. Identify the purpose assigned to each circuit by the equipment designer. A hose or supply line labelled seal water does not establish where that service acts. Keep the actual connection designations with the applicable support-plan description and project requirements.

Review an incomplete supply schedule

In a hypothetical process-pump quotation, the equipment list includes a quench supply while the specification separately requires process-side flushing. The buyer asks the supplier to identify how the second function is provided. Demonstrating the atmospheric-side service does not close a requirement at the process side, even when both services use a similar-looking fluid line.

Retain the accepted service allocation

Keep the final drawing, function-specific utility duties and supplier disposition together. Identify the parties supplying each service and the equipment states in which it remains required. The actual medium and operating conditions need the seal supplier’s approval. Do not turn an illustrative quench application into a generic connection or operating instruction for another seal.

Sources

Examples are illustrative. Confirm product-specific performance, compatibility and supply scope in the applicable documents.