Small wind / Buyer questions
Electrical diagnostics and service tests
Why can a logic pulse rise too slowly after an open-drain sensor cable changes?
The short answer
An open-drain output uses a pull-up path to reach its high state when the output releases. Texas Instruments explains that rise time depends on pull-up resistance and load capacitance. A cable or receiver change can therefore affect the time needed to cross the receiver's high threshold. At a higher event rate the receiving input may see a shorter effective high interval even when the sensor still switches at the expected times.
Identify the exact interface
Record the sensor output type, supply, permitted pull-up voltage, pull-up location and receiver thresholds. Confirm whether the input already includes a pull-up and what other devices share the signal. In a hypothetical retrofit the cabinet receives the same sensor through a longer cable and an additional input. The new loading changes the rising waveform, even though the original device and nominal pulse frequency remain the same.
Measure at the input boundary
Ask the qualified reviewer to capture the waveform where the receiver measures it, using a suitable instrument and approved test arrangement. Compare low level, high level and time spent within the receiver's recognized states. Note cable type and length, operating frequency and the test configuration. Evidence at the sensor connector can differ from evidence at the far end of the installed circuit.
Evaluate any proposed correction together
Use the device specifications for allowable current, voltage and timing. A change in pull-up arrangement can affect low-state current, interference margin and rise time together. Record the approved interface and the verified waveforms for the operating range. This distinguishes an electrical edge problem from a counter filter setting and gives maintenance staff the information needed to preserve the signal when replacing the cable.
Sources
Examples are illustrative. Confirm product-specific performance, compatibility and supply scope in the applicable documents.