Small wind / Buyer questions
Electrical diagnostics and service tests
Can a passing wind-site earth resistance close its step and touch voltage assessment?
The short answer
A single resistance value does not describe every local voltage difference around an earthing arrangement. Megger's wind-farm guidance identifies step and touch voltages as separate issues associated with fault currents and the ground system. Ask the responsible specialist which locations, fault cases and applicable criteria the assessment covers before closing those items solely from an earth resistance result.
Identify the locations relevant to the assessment
Retain the site layout and identify equipment, accessible metalwork and ground locations included in the agreed scope. The relevant fault and protective clearing conditions should be documented by the responsible engineering team. A result at one measurement point does not establish all of those spatial and operating conditions.
Compare the report with its intended exposure case
In a hypothetical handover, an electrode result is provided but the project also requires an assessment around a fence and tower access area. Ask for the supporting model or measurements and the specialist's interpretation for those locations. The acceptance evidence should identify which fault and connected-system arrangement it represents.
Preserve the specialist's conclusion and boundaries
Keep the earth test, fault basis and location-specific findings with the final drawings. Record any layout or protection change that the engineering team determines needs review. This gives the buyer a traceable basis for each requested acceptance decision without assigning all local voltage behavior to one aggregate measurement.
Sources
Examples are illustrative. Confirm product-specific performance, compatibility and supply scope in the applicable documents.